Lightning and surge protection for PV installations

- Advertisment -

According to the Department of Energy, the annual 24-hour global solar radiation average is about 220 W/m2 for South Africa, compared with about 150 W/m2 for parts of the USA, and about 100 W/m2 for Europe and the United Kingdom, making South Africa’s solar resource one of the highest in the world. 

Most areas in South Africa average more than 2500 hours of sunshine per year, and average solar-radiation levels range between 4,5 and 6,5 kWh/m2 in one day. These statistics cause many to support the development of a local solar industry, we must also remember that across wide stretches of our country, we have one of the highest lightning ground flash densities in the world. This therefore makes lighting protection of solar systems an imperative.

Photovoltaic (PV) systems have become a significant sector within the energy market in recent years and it is therefore important that the development of affordable, inexhaustible and clean solar energy technologies will, among other benefits, allow a country to increase its energy security, reduce pollution which is expected to play an important role in controlling climate change. However, because PV plants are subject to weather, it’s essential to protect sensitive electronic system components from failure due to lightning flashes and surges.

Lightning surges in a PV system can damage PV modules and inverters. In the event of a system failure, this can lead to profit losses in addition to the costs of repair or replacement. Therefore, one should aim to protect the solar plant from damage by fire, such as may be caused by a direct lightning strike, as well as protecting the electrical and electronic systems against the effects of lightning electromagnetic impulses (LEMP).

Steps which can be taken to protect the air-termination system and down conductor system, the earth termination system, the lightning equipotential bonding, the surge protection measures in the PV array and the surge protection measures for IT systems.

Air-termination system and down conductor system

For the protection of the PV array against direct lightning strikes, it is necessary to arrange the solar modules in the protection zone of an isolated air-termination system.

  • According to the class of lightning protection system, the height and the quality of the air-termination rods required is determined by means of the rolling sphere method.
  • The separation distance must be kept between the PV supporting frames and the air-termination rods.
  • Additionally, the operation building must be equipped with external lightning protection. Down conductors must be connected with the earth-termination system by using terminal lugs. These must be made out of corrosion- resistant material, or protected by corresponding measures (such as applying sealing tape or heat-shrinkable sleeve).

Earth-termination system

The earth-termination system of the PV system is designed as a ring earth electrode (surface earth electrode), while the earth-termination system of the operation building should be designed as a foundation earth electrode.

  • The metal supporting frames, onto which the PV modules are fixed, must be connected to the earth-termination system approximately every 10 m.
  • The earth-termination system of the PV system and the earth-termination system of the operation building must be connected to each other via at least one conductor. The interconnection of the individual earth-termination systems considerably reduces the total earthing resistance, while the intermeshing of the earth-termination system creates an equipotential surface that considerably reduces the voltage load of lightning effects on the electric connecting cables between the PV array and operation building.

Lightning equipotential bonding

All conductive systems entering the operation building from outside must be generally included into the lightning equipotential bonding.

  • The requirements of lightning equipotential bonding are fulfilled by the direct connection of all metal systems and by the indirect connection of all live systems via lightning current arresters.
  • Lightning equipotential bonding should be performed preferably near the entrance of the structure in order to prevent partial lightning currents from entering the building.

Surge protection measures in the PV array

To reduce the load on the isolation inside the solar modules at a lightning strike into the isolated air-termination system, thermally monitored surge protective devices are installed in a generator junction box as loosely as possible to the PV generator.

  • On the DC side, a surge protective device is installed in each generator junction box.
  • The surge protective devices in the generator junction boxes assume the protection for the PV modules locally and ensure that no spark overs caused by conducted or field-related interferences come up at the PV modules.

Surge protection measures for IT systems

The operation building provides a remote diagnostics system, which is used for the quick and easy function check of the PV systems, permitting the operator to recognise and remedy any malfunctions at an early stage.

  • The remote supervisory control system provides the performance data of the PV generator constantly in order to optimise the output of the PV system.
  • Measurements of wind velocity, module temperature and ambient temperature are performed via external sensors at the PV system and can be read directly from the acquisition unit.
  • The data acquisition unit provides an Ethernet interface, which a PC and/or modems are connected to for remote enquiry and maintenance. Thus, the service engineers can determine the cause of a malfunction by telediagnosis and then directly eliminate it.
  • In order to provide continuous transmission of the measured data to the measuring unit, the sensor cables entering the building must be led via surge protective devices.
  • Safety in the forwarding of the measured data via the telecommunication network by modem must be given as well, to provide a continuous monitoring and optimisation of the performance of the installation.

Contact Hannes Ackermann, Dehn Africa, Tel 011 704-1487, hannes.ackermann@dehn-africa.com

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Latest Articles

Independent transmission system “essential” to end load shedding

by Roger Lilley, Now Media  -   To overcome the scourge of load shedding, two components are urgently needed: more generating capacity and an improved and...

Drivers improving the business case for solar power

Information from IM Power  -   Covid-19 has presented businesses with the opportunity to re-evaluate both their operational models and costs. Proactive organisations found themselves navigating...

Temperature monitor and controller saves municipality money

Instrotech recently supplied its DPM4003 and DPM3001M (low- and high-alarm relay output) temperature indicators to Levivi22 Engineering and Projects, the company contracted by Tshwane...

Undertaking wall thickness testing at Tutuka

During the lockdown in June, rope-access specialist Skyriders undertook an inspection of pulverised fuel (PF) piping at Tutuka power station near Standerton in Mpumalanga...

Rentable solar power now available

Aggreko, a leading provider of mobile, modular power, temperature control and energy services, today announces the immediate availability of its solar power rental offer....

EU solar power association signs cooperation agreement with SAPVIA

SolarPower Europe and the South African Photovoltaic Industry Association (SAPVIA) have signed a Memorandum of Understanding (MoU) to strengthen cooperation and explore new business...

First BW4 wind farm celebrates commencement of commercial operations

South Africa’s first bid window four (BW4) wind farm, part of government’s Renewable Energy Independent Power Producer Procurement Programme (REIPPPP), has announced its Commercial...

Maintaining backup battery systems for maximum usage and reliability

Information from Fluke  -   Most backup power systems use an uninterruptable power supply (UPS) and a string of batteries. The UPS backs up the digital...

Renewable energy company offers bursaries for tertiary education

Globeleq, a leading independent power producer operating in Africa, is offering bursaries for tertiary education. The Globeleq Scholarship Fund aims to develop skills needed...

SA’s Risk Mitigation tender and what it means for energy storage, renewables and gas

by Andy Colthorpe, Energy-Storage news  -   South Africa’s Ministry of Mineral Resources and Energy is conducting a fairly unique procurement programme for 2 GW of...

Eskom acknowledges load shedding’s damage to the economy, promises improvement

Eskom's CEO, Andre de Ruyter, says the power utility understands that it has a critical role to play in enabling South Africa's economic recovery...

MEA Energy Week conference draws world-class lineup

Information from Siemens  -  Siemens Energy and partners are holding a major Middle East and Africa-focused virtual conference, entitled ‘Shaping the Energy of Tomorrow’, from...

How to classify outdoor circuit breakers

Information from Noja Power  -   Electrical engineering switchgear classification is a challenging topic. With the varied terminology for electrical equipment around the world, clarity on...

What’s on the energy storage market besides Li-ion batteries?

Information from IDTechEx  -   While Li-ion batteries are dominating the stationary energy storage sector, a growing number of companies are developing different technologies to be...

Electrical junction box offers ten entries

A rectangular-shaped junction box, which is both Ex e and IP68 certified, is now available from Pratley. Known as the Enviro Rectangular Junction Box,...
- Advertisement -